My Project at Home

When you have limited resources, you could only plan a project according to your capabilities. When I arrived here in the Philippines a month ago, I decided to extend my place. I hired 15 workers and make one bedroom and a dining area. Here are the progress for the last 8 days now.
The picture above is the progress in 5 days. They are done with the second floor flooring.
The picture above is when they did the posts.
Here is when they did the mapping.
This is when they dug the hole for the posts about 4 feet deep.
The second floor concrete flooring was poured in. The picture below is when I took the picture at the second floor showing the street below.
Showing the materials ... the wood framing would costs a lot. So, if you have these wood materials, after the concrete project will be completed....will be useless. On my part, I will either donate it to my relatives or, make a wood house in my aunt's place. These wood framing materials costs almost $1,500.
Some workers were having a fun time up there. PSSTTTT...be careful!
Anyway, it is now in their 8th day, they are framing the rooftop.



They will stop for 8 days after working for 12 days just to season the concrete flooring. They will resume after those days and probably, my project will resume for another 15 days and will be done by then,HOPEFULLY!